Structure and equipment

  • 600 tons Travel lift
  • 2,000m2 shed area for painting/covered work
  • Technical open air area – vessels up to 70m LOA
  • Covered spaces for vessels of up to 30m LOA
  • 8.500m2 of hard standing

 

 

Thanks to Ascom spa for the film material